So the deck project is underway.
First we pour some concrete piers....

Next is some steel fabrication including welding the legs to the main beam.

Here we have the main beam in place.

After that we start with the rim joists, which are 10" steel C-channels. Steph is checking for level here.

At the end of the weekend we had this much done.